A single data center campus draws 100 MW or more, with load swings that hit the grid in seconds. Real-time simulation and hardware-in-the-loop testing build a digital twin of the facility and surrounding grid, stress-testing worst-case scenarios — sudden load spikes, mass generator switchovers and voltage sags — before any physical connection.