Data Center Decommissioning: What Is It and Why Does It Matter?
Hexatronic Data Center outlines the full lifecycle of data center decommissioning, from asset inventory and certified data destruction to e-waste recycling and facility restoration. Covers common triggers including cloud migration and consolidation, compliance risks under HIPAA and GDPR and strategies for recovering value from retired hardware.
-
·
Data Center Decommissioning: Best Practices and Considerations
Decommissioning a data center moves through eight stages: planning, hardware inventory, data backup, secure data clearing, equipment removal, reuse or recycling, facility cleanup and final documentation. Data destruction methods include overwriting, degaussing and physical destruction of drives. Working equipment goes to redeployment or certified resale.
-
·
Why Does It Take So Long to Connect a Data Center to the Grid?
U.S. high-voltage transmission construction fell from 1,700 miles per year to 180 over two years as data center demand surges — CenterPoint Energy saw interconnection requests jump from 1 GW to 8 GW in one year. Multi-year connection delays trace to insufficient buildout, planning tools designed for slow growth and rigid worst-case assumptions that ignore…
-
·
A State Playbook for Managing Data Center-Driven Load Growth (PDF)
State policymakers are equipped to manage data center-driven load growth through various strategies that balance economic development with energy affordability and reliability. The playbook addresses challenges such as ensuring fair transmission cost contributions from data centers, managing risks of over-investment in infrastructure, and aligning data center expansion with clean energy policies while safeguarding consumer interests.
-
·
Ordering the Reform of the Nuclear Regulatory Commission
President Trump orders a wholesale overhaul of Nuclear Regulatory Commission licensing, capping new reactor approvals at 18 months and directing agencies to adopt updated radiation safety limits. The executive order targets 400 GW of installed nuclear capacity by 2050, positioning reactors to power AI data centers and other high-demand industrial loads.
-
·
Data Centers Issue Brief | National Caucus of Environmental Legislators
This NCEL issue brief outlines state legislative strategies to address data center impacts on the electricity grid, ratepayers, and clean energy goals. It highlights bills from Texas, Georgia, Utah, Virginia, Minnesota, and New Jersey covering transparency requirements, ratepayer protections, demand response programs, and clean energy mandates for data centers. The brief notes that electricity costs…
-
·
Four Pillars of Data Center Reform
In Virginia, a coalition of more than 50 organizations pushes four pillars of data center reform: mandatory disclosure of energy and water use, state-level regulatory review, ratepayer cost protections and clean energy standards tied to tax exemptions. Dominion Energy has contracted 47 gigawatts for data centers, nearly triple its current peak capacity.